첫 페이지 News 본문

The Greater Bay Area Airlines, headquartered in Hong Kong, is undergoing a year long preparation to prove the airworthiness of the Boeing 737 Max 9 aircraft to the Civil Aviation Authority of Hong Kong. At the beginning of this month, the Federal Aviation Administration of the United States grounded most of the Boeing 737 Max 9 jet planes after a Boeing 737 Max 9 cabin door fell off during flight, causing the plane to make an emergency landing. The Federal Aviation Administration plans to continue this measure until extensive inspections are completed.
After the Alaska aviation accident, Greater Bay Area Airlines issued a statement stating that it currently has 5 Boeing 737-800 aircraft, which are "completely different" from the aircraft involved in the incident. In addition, the company announced in March last year that it had ordered 15 737-9 aircraft from Boeing, which was originally expected to be delivered gradually by the end of this year.
The CEO of Greater Bay Area Aviation, Hsu Han chung, said in a Bloomberg interview that Hong Kong's certification process "must be extended and may take longer to complete.".
CandyLake.com is an information publishing platform and only provides information storage space services.
Disclaimer: The views expressed in this article are those of the author only, this article does not represent the position of CandyLake.com, and does not constitute advice, please treat with caution.
您需要登录后才可以回帖 登录 | Sign Up

本版积分规则

因醉鞭名马幌 注册会员
  • Follow

    0

  • Following

    0

  • Articles

    43