The maximum iron ore production capacity of the Vale Capanema project has been tested and may be increased
youki676
发表于 2024-12-4 15:42:14
1174
0
0
On December 4th, it was learned from Vale that the company has started trial operation of the Capanema Maximization Project, which aims to increase the annual iron ore production capacity of the Mariana Comprehensive Operation Area in Minas Gerais, Brazil by 15 million tons.
CandyLake.com is an information publishing platform and only provides information storage space services.
Disclaimer: The views expressed in this article are those of the author only, this article does not represent the position of CandyLake.com, and does not constitute advice, please treat with caution.
Disclaimer: The views expressed in this article are those of the author only, this article does not represent the position of CandyLake.com, and does not constitute advice, please treat with caution.
You may like
- Top 20 US Stock Exchange Transactions: Musk claims that China's industrial production capacity has far exceeded that of the United States
- The 3 millionth complete vehicle has been produced! Shanghai Super Factory Becomes Tesla's' Capacity Responsibility '
- Vale: Iron ore production in Q3 increased by 5% year-on-year
- Vale: Iron ore production in Q3 increased by 5% year-on-year
- Vale's iron ore production in Q3 2024 reaches a new high since Q4 2018
- In the third quarter of 2024, Vale's iron ore shipments increased by 2% year-on-year
- TSMC will create an "Advanced Supply Chain Zone" to support advanced packaging capacity
- NIO Energy's Wuhan Manufacturing Center will have a maximum production capacity of 1500 battery swapping stations next year
- NIO Energy's Wuhan Manufacturing Center will have a maximum production capacity of 1500 battery swapping stations next year